| Sign In | Join Free | My lightneasy.org |
|
Connectivity Options : Wi-Fi 2.4GHz, Bluetooth 5.0 BLE, Tuya Smart Module
Delivery Time : 20-30 days for mold development, 30-40 days for mass production
Certification : CE, RoHS, FCC, ETL, CARB, ISO 9001:2015
Mold Development Lead Time : 20-30 Days (T1 Sample)
Model Number : APS-2000
CADR Range : 200-500 m³/h (Customizable Fan Motor Selection)
Certification Support : CE, RoHS, FCC, ETL, CARB, Energy Star Pre-compliance
Sensor Options : Laser PM2.5, PM10, VOC Gas, CO2, Temperature, Humidity
Fan Motor Options : AC Shaded Pole, DC Brushless EC Motor
Coverage Options : 300-800 sq ft Based on Motor Configuration
Quality Control : CADR Testing, Noise Chamber Test, Filter Efficiency Validation, 48-Hour Burn-in
Mold Type : Injection Mold, 2-Plate / 3-Plate, Hot Runner, Insert Molding
Supply Ability : 20000 Pieces per Month
Filtration Options : H11 / H13 HEPA, Activated Carbon, Cold Catalyst, UV-C, Ionizer
Place of Origin : Shenzhen, Guangdong, China
Cost Optimization : BOM Analysis, Motor Selection Optimization, Filter Media Benchmarking
Brand Name : OEM/ODM
Packaging Details : Custom branded color box with molded EPE foam protection, export-grade double-wall corrugated carton, 1 pc per carton
Service Scope : Component Sourcing, Sensor Integration, Filter Specification, PCB Design, Mold Fabrication, Assembly, QA Testing
Payment Terms : T/T,L/C,PayPal,Western Union
|
|
AI Air Purifier ODM Solution End-to-End Development Mold Production for Global Brands Images |